home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V15_0 / V15NO067.TXT < prev    next >
Internet Message Format  |  1993-07-13  |  33KB

  1. Date: Tue,  4 Aug 92 05:06:21    
  2. From: Space Digest maintainer <digests@isu.isunet.edu>
  3. Reply-To: Space-request@isu.isunet.edu
  4. Subject: Space Digest V15 #067
  5. To: Space Digest Readers
  6. Precedence: bulk
  7.  
  8.  
  9. Space Digest                Tue,  4 Aug 92       Volume 15 : Issue 067
  10.  
  11. Today's Topics:
  12.            Bono's Politics (was Re: Clinton Space Position)
  13.           Energiya's role in Space Station assembly (2 msgs)
  14.                             Galileo issues
  15.                                  NASP
  16.                         Soyuz as ACRV (9 msgs)
  17.                        SPS and light pollution
  18.                                  SSF
  19.              Two-Line Orbital Element Set:  Space Shuttle
  20.  
  21.     Welcome to the Space Digest!!  Please send your messages to
  22.     "space@isu.isunet.edu", and (un)subscription requests of the form
  23.     "Subscribe Space <your name>" to one of these addresses: listserv@uga
  24.     (BITNET), rice::boyle (SPAN/NSInet), utadnx::utspan::rice::boyle
  25.     (THENET), or space-REQUEST@isu.isunet.edu (Internet).
  26. ----------------------------------------------------------------------
  27.  
  28. Date: 3 Aug 92 22:46:38 GMT
  29. From: steve hix <fiddler@concertina.Eng.Sun.COM>
  30. Subject: Bono's Politics (was Re: Clinton Space Position)
  31. Newsgroups: sci.space
  32.  
  33. In article <1992Aug3.145650.1@fnalb.fnal.gov> higgins@fnalb.fnal.gov (Bill Higgins-- Beam Jockey) writes:
  34. >In article <yd6x7sr@rpi.edu>, strider@acm.rpi.edu (Greg Moore) writes:
  35. >>     I went to the U2 concert in Albany NY a few months ago, and while
  36. >> their, the lead singer, Bono made the following comment: 
  37. >
  38. >Speaking of politics, I have heard that Bono is now running for
  39. >Senator in California...
  40.  
  41. Ummm,,,wrong Bono.
  42.  
  43. The one in California is (was?) Sonny. 8}
  44.  
  45.  
  46.  
  47.  
  48.  
  49. --
  50. -----------------------------------------------------------------------
  51. Of making many books there is no end...  |  What's wrong with chasing 
  52.                        -- Eccl. 12:12    |  nebulae till 3 am?  |-(
  53. -----------------------------------------------------------------------
  54.  
  55. ------------------------------
  56.  
  57. Date: 3 Aug 92 22:18:03 GMT
  58. From: Matthew DeLuca <ccoprmd@prism.gatech.EDU>
  59. Subject: Energiya's role in Space Station assembly
  60. Newsgroups: sci.space
  61.  
  62. In article <BsFDz9.nI@zoo.toronto.edu> henry@zoo.toronto.edu (Henry Spencer) writes:
  63. >In article <1992Aug2.124306.3068@titan.ksc.nasa.gov> dumoulin@titan.ksc.nasa.gov (Jim Dumoulin) writes:
  64. >>  Besides, how would you propose something as large as the Energiya would
  65. >>  get shipped out of Baikonur.  The US ships its External Tank by barge
  66. >>  fromMichoHow would an Energiya get here?
  67.  
  68. >The same way it's shipped to Baikonur now:  by air.  This is what the
  69. >Antonov Mriya was built for...
  70.  
  71. Unless I am mis-remembering, the range of the transport craft loaded down 
  72. with an Energia core is something under a thousand miles.  Unless they
  73. have in-flight refuelling for the thing, which I doubt, you're going to 
  74. have to cross Siberia, Alaska, and Canada to get that thing to the U.S.
  75. I wouldn't want to fly something like that on that route.
  76. -- 
  77. Matthew DeLuca                      "I'd hire the Dorsai, if I knew their 
  78. Georgia Institute of Technology      P.O. box."
  79. Office of Information Technology                - Zebediah Carter, 
  80. Internet: ccoprmd@prism.gatech.edu              _The Number of the Beast_
  81.  
  82. ------------------------------
  83.  
  84. Date: Mon, 3 Aug 1992 22:43:27 GMT
  85. From: Henry Spencer <henry@zoo.toronto.edu>
  86. Subject: Energiya's role in Space Station assembly
  87. Newsgroups: sci.space
  88.  
  89. In article <64974@hydra.gatech.EDU> ccoprmd@prism.gatech.EDU (Matthew DeLuca) writes:
  90. >Unless I am mis-remembering, the range of the transport craft loaded down 
  91. >with an Energia core is something under a thousand miles.  Unless they
  92. >have in-flight refuelling for the thing, which I doubt, you're going to 
  93. >have to cross Siberia, Alaska, and Canada to get that thing to the U.S.
  94. >I wouldn't want to fly something like that on that route.
  95.  
  96. So contract the Russians to do it, payment on successful delivery only.
  97. They aren't as timid about flying space hardware through weather, as
  98. witness them bringing the Buran orbiter into Paris through a rainstorm.
  99.  
  100. Besides, they'd probably have the thing fitted for refuelling (if it
  101. isn't so fitted already -- strikes me as useful enough to be worth it)
  102. before we finished haggling over the price.  That isn't a big deal.
  103. -- 
  104. There is nothing wrong with making      | Henry Spencer @ U of Toronto Zoology
  105. mistakes, but... make *new* ones. -D.Sim|  henry@zoo.toronto.edu  utzoo!henry
  106.  
  107. ------------------------------
  108.  
  109. Date: 4 Aug 92 06:13:40 GMT
  110. From: Ron Baalke <baalke@kelvin.jpl.nasa.gov>
  111. Subject: Galileo issues
  112. Newsgroups: sci.space
  113.  
  114. In article <n0655t@ofa123.fidonet.org>, David.Anderman@ofa123.fidonet.org writes...
  115. >I would like to explore some possible means of capturing the Galileo
  116. >data by using an inexpensive spacecraft as a relay  station, and hope 
  117. >that one of these may prove useful.
  118. >1)      Use of Soviet hardware. 
  119.  
  120. I don't think the Soviets are in a position politically or econimically to
  121. be able provide a launch vehicle in time for Galileo by 1995.  They have
  122. offered the use of their 70 meter antennas to be arrayed with the Deep
  123. Space Network's antennas.
  124.  
  125. >2.      A Discover-class spacecraft. 
  126.  
  127. At one point there was discussion to send a modified satellite out the Jupiter
  128. to be used as a relay satellite.  However, since 70% of the mission can still
  129. be accomplished using the Low Gain Antenna, this idea has pretty much been
  130. dropped through the cracks.
  131.  
  132. >3.      Use of Cassini. During the early 2000's, the Cassini spacecraft will
  133. >use Jupiter as a slingshot to reach its intended target of Saturn. 
  134.  
  135. Cassini isn't due to flyby Jupiter until December 30, 2000.  Galileo will 
  136. likely be not operational by then, its orbital mission around Jupiter
  137. runs from 1995 to 1997.  It is true that some spacecraft have lived
  138. well beyond their designed lifetimes, but Galileo will be in a particularly
  139. harsh environment in Jupiter's radiation belt.  Also, a Cassini flyby is too
  140. short of a duration to be used as an effective relay.
  141.  
  142. >4.      Use of Ulysses. This spacecraft is presently in an orbit that takes
  143. >it out of the ecliptic, and over the poles of the Sun. Its orbit does
  144. >intercept the ecliptic, at the distance of Jupiter. Can Ulysses' orbit
  145. >be modified so that the next time it reaches its maximum distance from the
  146. >Sun at the ecliptic that Jupiter is nearby, and thus Ulysses serve as a 
  147. >relay station?
  148.  
  149. Ulysses will come somewhat close to Jupiter in 2004.  Same arguments as with
  150. Cassini plus it is not known what Ulysses' operational status will be in 2004,
  151. which is 9 years past its primary mission.
  152.      ___    _____     ___
  153.     /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  154.     | | | |  __ \ /| | | |     Jet Propulsion Lab |
  155.  ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | You can't hide broccoli in
  156. /___| | | |  ___/    | |/__ /| Pasadena, CA 91109 | a glass of milk - 
  157. |_____|/  |_|/       |_____|/                     | anonymous 7-year old.
  158.  
  159. ------------------------------
  160.  
  161. Date: 4 Aug 92 00:37:20 GMT
  162. From: John Roberts <roberts@cmr.ncsl.nist.gov>
  163. Subject: NASP
  164. Newsgroups: sci.space
  165.  
  166. -From: john@newave.mn.org (John A. Weeks III)
  167. -Subject: Random Notes (Was Re: NASP, NLS, SSTO, etc.)
  168. -Date: 1 Aug 92 02:13:04 GMT
  169. -Organization: Newave Communications, Ltd, Lake Wobegon, MN
  170.  
  171. -While driving into the parking lot at the USAF Museum in Dayton on Monday,
  172. -I saw an X-30 mock-up departing Wright-Patterson AFB on the back of a
  173. -semi-truck.  It was painted white and blue with red trim.  Since the plane
  174. -was about 40 feet long, I suspect that it was a 1/3 scale mock-up.
  175.  
  176. They were showing off a small model of NASP on NASA Select last week.
  177. (It's about a foot long.) In this model, the engines are on the bottom,
  178. with their fronts a little more than half of the way back. The last 1/4 or
  179. so of the bottom is a flat open area, where much of the combustion actually
  180. takes place. (So the "engines" are perhaps more accurately described as
  181. airscoops/mixers/ignitors.)
  182.  
  183. This would appear to be consistent with the posts in recent months on
  184. scramjet technology. The promotional computer-animated video shown 
  185. periodically on NASA Select still shows the engine outlets right at the
  186. back of the aircraft.
  187.  
  188. John Roberts
  189. roberts@cmr.ncsl.nist.gov
  190.  
  191. ------------------------------
  192.  
  193. Date: 3 Aug 92 21:53:23 GMT
  194. From: Mary Shafer <shafer@rigel.dfrf.nasa.gov>
  195. Subject: Soyuz as ACRV
  196. Newsgroups: sci.space
  197.  
  198. Article-I.D.: rigel.SHAFER.92Aug3145317
  199. References: <64933@hydra.gatech.EDU> <1992Aug3.173912.29777@iti.org>
  200.     <64946@hydra.gatech.EDU> <1992Aug3.200027.14041@iti.org>
  201. Sender: Usenet news <news@news.dfrf.nasa.gov>
  202. Organization: NASA Dryden, Edwards, Cal.
  203. Lines: 32
  204. In-Reply-To: aws@iti.org's message of 3 Aug 92 20:00:27 GMT
  205. Source-Info:  Sender is really news@CRABAPPLE.SRV.CS.CMU.EDU
  206. Source-Info:  Sender is really isu@VACATION.VENARI.CS.CMU.EDU
  207.  
  208. On 3 Aug 92 20:00:27 GMT, aws@iti.org (Allen W. Sherzer) said:
  209.  
  210. AWS> In article <64946@hydra.gatech.EDU> ccoprmd@prism.gatech.EDU (Matthew DeLuca) writes:
  211.  
  212. >>How do you figure that? The money needed to build know-how and all that
  213. >>is being spent flying Shuttle. That's the problem.
  214.  
  215. >No, we're getting the knowhow *from* the Shuttle...we've learned more about
  216. >high-speed aerodynamics alone, just as an example, from the Shuttle than 
  217. >we've learned in 20 years before that.  
  218.  
  219. I'm not sure I'd go that far.  We learned a lot, but we knew a lot
  220. well before we started.  The X-15, Reentry F, the Sandia vehicles: all
  221. these were a pretty good base to build on.  
  222.  
  223. See Iliff and Shafer, "Space Shuttle Hypersonic Flight Research and
  224. the Comparison to Ground Test Facilities (Invited)", AIAA 92-3988,
  225. which was presented at the AIAA Ground Test Conference in Nashville,
  226. TN, last month.  Actually, read the papers listed in the references.
  227.  
  228. AWS> At what cost? Sacrificing everything to high-speed aerodynamics just 
  229. AWS> isn't a good idea.
  230.  
  231. I don't know why you say this.  It sounds like a _great_ idea to me.
  232.  
  233. Mary Shafer
  234. Dryden Hypersonic Aircraft Group
  235.  
  236. --
  237. Mary Shafer  DoD #0362 KotFR NASA Dryden Flight Research Facility, Edwards, CA
  238. shafer@rigel.dfrf.nasa.gov                    Of course I don't speak for NASA
  239.  "A MiG at your six is better than no MiG at all."  Unknown US fighter pilot
  240.  
  241. ------------------------------
  242.  
  243. Date: 3 Aug 92 21:58:17 GMT
  244. From: Matthew DeLuca <ccoprmd@prism.gatech.EDU>
  245. Subject: Soyuz as ACRV
  246. Newsgroups: sci.space
  247.  
  248. In article <1992Aug03.193652.29399@eng.umd.edu> sysmgr@king.eng.umd.edu writes:
  249. >In article <64951@hydra.gatech.EDU>, ccoprmd@prism.gatech.EDU (Matthew DeLuca) writes:
  250.  
  251. >>I don't think you can fit any usable cargo in a three-man capsule.
  252.  
  253. >So if you don't put men in them, what do you have room for? I'd say that you'd
  254. >have at least the weight for oh 200lbs/person x 3 people = 600lbs of cargo.
  255. >Strip or fold the seats out...c'mon, you make it sound like it's SOOO
  256. >difficult. 
  257.  
  258. This is the ACRV, remember?  Don't you think the people who are taking 
  259. the thing down would like to have seats to ride in?  
  260. -- 
  261. Matthew DeLuca                      "I'd hire the Dorsai, if I knew their 
  262. Georgia Institute of Technology      P.O. box."
  263. Office of Information Technology                - Zebediah Carter, 
  264. Internet: ccoprmd@prism.gatech.edu              _The Number of the Beast_
  265.  
  266. ------------------------------
  267.  
  268. Date: 3 Aug 92 22:16:14 GMT
  269. From: Matthew DeLuca <ccoprmd@prism.gatech.EDU>
  270. Subject: Soyuz as ACRV
  271. Newsgroups: sci.space
  272.  
  273. In article <1992Aug3.200027.14041@iti.org> aws@iti.org (Allen W. Sherzer) writes:
  274. >In article <64946@hydra.gatech.EDU> ccoprmd@prism.gatech.EDU (Matthew DeLuca) writes:
  275.  
  276. >Let's compromise. I'll earmark a third of my savings to NASP. That will
  277. >be enough to build a NASP vehicle which will provide far better data on
  278. >high speed flight.
  279.  
  280. When did you get to do the earmarking?  That's Congress that gets to do that, 
  281. and they certainly don't look at money in the same way.
  282.  
  283. >>>1. HLV flights   $400M  (2 flights/year each carries a Soyuz and supplies)
  284.  
  285. >>Since the HLV doesn't exist, this number is pretty meaningless.
  286.  
  287. >On the contrary. 95% of this HLV can be bought off the shelf today. The 5%
  288. >that doesn't exist are basically chunks of metal. This is a very conservative
  289. >design with a saftey factor of two done by a company with a good track
  290. >record at building launchers.
  291.  
  292. Odd, I seem to recall just the other day that the Delta-deraived HLV design
  293. (is that the one we are talking about here?  I've lost track of the code
  294. names) transfers fuel about in response to engine failure.  Please don't 
  295. tell me that you think in-flight fuel transfer among boosters is just 'chunks
  296. of metal'.
  297.  
  298. >There is some risk associated with this number but it cannot reasonably
  299. >be called meaningless. Besides, the builder is willing to take on all
  300. >risk, all we need do is buy transport services.
  301.  
  302. As we've seen recently with the DoD bailing McDonnell-Douglas out, these
  303. assumptions of risk aren't quite all they seem.
  304.  
  305. Besides, the normal pork-barreling will assure that no matter what, we'll
  306. buy stuff from them anyway.
  307.  
  308. >If it works, we save billions, if it fails, we loose nothing. What's
  309. >your problem?
  310.  
  311. My problem is that this is the real world, and it doesn't quite work that 
  312. way.
  313.  
  314. >>>3. Cargo Return  $100M  (WAG, stick some Shuttle tiles on a canister and
  315.  
  316. >>Uh-huh...tether it down?  What are you attaching your tether to?  
  317.  
  318. >Space Station Freedon.
  319.  
  320. <clunk>
  321.  
  322. There went your microgravity work.
  323.  
  324. Not to mention, of course, that we heven't even begun to consider using 
  325. tethers to move payload about.  You can't just pull technologies out of 
  326. the air and use them on cost analyses.
  327.  
  328. >>Who puts the thing in the canister?  
  329.  
  330. >what thing?
  331.  
  332. Whatever you are trying to return to Earth.  
  333.  
  334. >>You need to put a bit more thought into this one.
  335.  
  336. >No, all I need to assert is that the problem can be solved for less
  337. >than $3 billion a year. If it can, then we save money.
  338.  
  339. Up above you asserted it can be done for $100 million, including startup 
  340. costs and everything.  You are clearly incorrect.
  341.  
  342. >Development costs are included for everything. This also includes the
  343. >interest on the bonds issued to fund development.
  344.  
  345. Wow...a whole new return system using tethers and everything, for only 
  346. $100 million?  Are we using the same dollars here?
  347.  
  348. >>Man-in-a-can is no replacement for the 
  349. >>Shuttle, no matter how much money you might save, 
  350.  
  351. >Why?
  352.  
  353. Because it is a step backwards in both technology and capability.
  354. -- 
  355. Matthew DeLuca                      "I'd hire the Dorsai, if I knew their 
  356. Georgia Institute of Technology      P.O. box."
  357. Office of Information Technology                - Zebediah Carter, 
  358. Internet: ccoprmd@prism.gatech.edu              _The Number of the Beast_
  359.  
  360. ------------------------------
  361.  
  362. Date: 3 Aug 92 22:23:43 GMT
  363. From: Matthew DeLuca <ccoprmd@prism.gatech.EDU>
  364. Subject: Soyuz as ACRV
  365. Newsgroups: sci.space
  366.  
  367. In article <BsFEGK.t1@zoo.toronto.edu> henry@zoo.toronto.edu (Henry Spencer) writes:
  368. >In article <64941@hydra.gatech.EDU> ccoprmd@prism.gatech.EDU (Matthew DeLuca) writes:
  369.  
  370. >>Uh-huh.  You get what you pay for.  Using your scheme, we have zero 
  371. >>independent science capacity, zero cargo return capacity, and zero technological
  372. >>advancement.  We're trying to move forward, and you're wanting us to return 
  373. >>to the 60's in the name of the almighty dollar.
  374.  
  375. >Taking thirty years to admit you made a mistake is indeed deplorable, but
  376. >continuing to refuse to admit it is worse.
  377.  
  378. Huh?
  379.  
  380. I'm not saying that the Shuttle is the end-all and be-all of space 
  381. transportation, but it's hardly a mistake.  Say what you will, the 
  382. shuttle has capability equalled by no other behicle in the world.  I 
  383. just don't see using Soyuz capsules as an alternative.
  384.  
  385. >Trying to do muchos technological advancement on a vehicle that is also
  386. >supposed to provide an operational service is a massive mistake, as any
  387. >airliner company could tell you.
  388.  
  389. It depends on your definition of 'operational service'.  After Challenger
  390. they dropped a lot of the operational service aspects from the system, 
  391. and it's a lot more of a science and research vehicle.  
  392.  
  393. >Ballistic capsules for cargo return are well-understood technology which
  394. >NASA is now trying to revive, because the shuttle is unsuited to many of
  395. >the cargo-return missions the customers want to fly.
  396.  
  397. But it's better suited to many more.  I'd like to see Hubble come back in 
  398. a canister...
  399.  
  400. >Why exactly is "independent science capability" important?  Do remember
  401. >that Spacelab, which is a large piece of the shuttle's science capability,
  402. >was built in Europe.
  403.  
  404. I was referring to independent in the sense that we will have science
  405. capability independent of the space station.  Using capsules, it's the 
  406. station or nothing.  I wasn't considering the procurement of the Spacelab
  407. module.
  408.  
  409. >>Instead of incurring the massive startup costs and incompatibilities of 
  410. >>using Soyuz, why not wait the years or two extra and go for Delta Clipper, 
  411. >>and keep moving forward?  
  412.  
  413. >Why not do both?  DC, for all its importance, is still a slightly iffy
  414. >project... and it won't yield an *operational* spacecraft for a few years
  415. >yet even if it works perfectly.
  416.  
  417. I agree that it's not a sure bet, but by the time we can get a Soyuz system
  418. up and running, it'll be well into the second-level prototyping stage, and 
  419. we should be able to predict with some assurance whether or not it will 
  420. generate something usable.  Going through the expense and hassle of setting
  421. up Soyuz just to toss it away a couple of years later is silly.
  422.  
  423. -- 
  424. Matthew DeLuca                      "I'd hire the Dorsai, if I knew their 
  425. Georgia Institute of Technology      P.O. box."
  426. Office of Information Technology                - Zebediah Carter, 
  427. Internet: ccoprmd@prism.gatech.edu              _The Number of the Beast_
  428.  
  429. ------------------------------
  430.  
  431. Date: 3 Aug 92 22:30:37 GMT
  432. From: Matthew DeLuca <ccoprmd@prism.gatech.EDU>
  433. Subject: Soyuz as ACRV
  434. Newsgroups: sci.space
  435.  
  436. In article <BsFF5x.10t@zoo.toronto.edu> henry@zoo.toronto.edu (Henry Spencer) writes:
  437. >In article <64946@hydra.gatech.EDU> ccoprmd@prism.gatech.EDU (Matthew DeLuca) writes:
  438.  
  439. >I'm not as sold on the whole idea as Allen is, but claiming that the
  440. >shuttle is too good to replace is not a viable counterargument.
  441.  
  442. I'm not saying that.  Show me a proposal that has a capability similar to 
  443. the shuttle, and I'll go for it.  If capsules were so wonderful to begin 
  444. with, we would never have built the shuttle.
  445.  
  446. >>You are making the fatal mistake of tossing out a current technology for 
  447. >>one that doesn't exist yet...
  448.  
  449. >I didn't see Allen saying that.
  450.  
  451. I see Allen using the savings from canning the shuttle to build his pipe
  452. dreams.  Since you can only get savings by stopping the program, this 
  453. implies that the shuttle is stopped and *then* development on his stuff
  454. starts.
  455.  
  456. If it doesn't work, of course, we're back to 1976 with no manned space
  457. capability.
  458.  
  459. >>... Man-in-a-can is no replacement for the 
  460. >>Shuttle, no matter how much money you might save...
  461.  
  462. >Name one spaceflight function the shuttle can do that it can't.  (High-speed
  463. >airflight research is not spaceflight.)
  464.  
  465. I'd like to see a Soyuz:
  466.  
  467. (a)  Stay up for two weeks for large-scale biomedical studies.
  468.  
  469. (b)  Put a crew of three outside to mate a new booster to a communications
  470.      satellite.
  471.  
  472. (c)  Deploy and retrieve a tethered satellite.
  473.  
  474. (d)  Retrieve and return a long-duration exposure facility.
  475.  
  476. That's four things that the Shuttle has done (or will be doing) on just 
  477. its last three missions.  
  478.  
  479.  
  480. >>... When we have a functional 
  481. >>replacement for the shuttle, then we can talk.
  482.  
  483. >If you insist on seeing one but won't allow attempts to build one, that
  484. >talk may have to wait a long time...
  485.  
  486. Like I demonstrated above, going back thirty years in time is no replacement.
  487. -- 
  488. Matthew DeLuca                      "I'd hire the Dorsai, if I knew their 
  489. Georgia Institute of Technology      P.O. box."
  490. Office of Information Technology                - Zebediah Carter, 
  491. Internet: ccoprmd@prism.gatech.edu              _The Number of the Beast_
  492.  
  493. ------------------------------
  494.  
  495. Date: Mon, 3 Aug 1992 22:57:35 GMT
  496. From: Greg Hennessy <gsh7w@fermi.clas.Virginia.EDU>
  497. Subject: Soyuz as ACRV
  498. Newsgroups: sci.space
  499.  
  500. In article <64975@hydra.gatech.EDU> ccoprmd@prism.gatech.EDU (Matthew
  501. DeLuca) writes: 
  502. #But it's better suited to many more.  I'd like to see Hubble come back in 
  503. #a canister...
  504.  
  505. Red herring. HST isn't coming back on the shuttle either.
  506.  
  507. --
  508. -Greg Hennessy, University of Virginia
  509.  USPS Mail:     Astronomy Department, Charlottesville, VA 22903-2475 USA
  510.  Internet:      gsh7w@virginia.edu  
  511.  UUCP:        ...!uunet!virginia!gsh7w
  512.  
  513. ------------------------------
  514.  
  515. Date: 3 Aug 92 23:34:40 GMT
  516. From: Matthew DeLuca <ccoprmd@prism.gatech.EDU>
  517. Subject: Soyuz as ACRV
  518. Newsgroups: sci.space
  519.  
  520. In article <1992Aug3.225735.10608@murdoch.acc.Virginia.EDU> gsh7w@fermi.clas.Virginia.EDU (Greg Hennessy) writes:
  521. >In article <64975@hydra.gatech.EDU> ccoprmd@prism.gatech.EDU (Matthew
  522. >DeLuca) writes: 
  523.  
  524. >#But it's better suited to many more.  I'd like to see Hubble come back in 
  525. >#a canister...
  526.  
  527. >Red herring. HST isn't coming back on the shuttle either.
  528.  
  529. It's an example.  Replace it with any complex and delicate piece of orbital
  530. equipment that we might want to retrieve.
  531. -- 
  532. Matthew DeLuca                      "I'd hire the Dorsai, if I knew their 
  533. Georgia Institute of Technology      P.O. box."
  534. Office of Information Technology                - Zebediah Carter, 
  535. Internet: ccoprmd@prism.gatech.edu              _The Number of the Beast_
  536.  
  537. ------------------------------
  538.  
  539. Date: 3 Aug 92 23:46:06 GMT
  540. From: Mark Littlefield <mll@aio.jsc.nasa.gov>
  541. Subject: Soyuz as ACRV
  542. Newsgroups: sci.space
  543.  
  544. In article <1992Aug3.194312.12437@iti.org>, aws@iti.org (Allen W. Sherzer) writes:
  545. |> In article <1992Aug3.171737.22332@aio.jsc.nasa.gov> mll@aio.jsc.nasa.gov writes:
  546. |> 
  547. |> >It's not the flight certification that is the problem.  There are
  548. |> >several issues that NASA must address before Soyuz can be used as am
  549. |> >ACRV.  First it must be adjusted for long term deployment on orbit.
  550. |> >As it currenly stands, Soyuz has an on-orbit life span of about 90
  551. |> >days (if memory serves) due to battery constraints.  This is clearly
  552. |> >not enough for an ACRV.  
  553. |> 
  554. |> Sure it is. We just do what the Russians do and use it as crew transport
  555. |> as well. 
  556. |> 
  557.  
  558. No problem, if that's all you need.  Are you willing to expend the
  559. logistics modules that would be brought up and down with a crew rotation?
  560.  
  561. |> >Also, Soyuz will need to be certified for a
  562. |> >possible water landing.  We do not have areas like the steppes of Asia
  563. |> >to land in like the Russians.  
  564. |> 
  565. |> Soyuz can stay in orbit for days if needed. All the crew need do is
  566. |> evacuate to Soyuz and wait until they can land on land.
  567. |> 
  568.  
  569. Again, no problem on the surface.  Although Soyuz has never had to
  570. land in water, it has missed it's target area by hundreds of miles on
  571. more than one occasion.  We simply do not have the land mass to
  572. support that sort of system and at +- 28.5 degrees, there is not a lot
  573. to look for in a land landing except maby the sahara or the indian
  574. subcontinent.
  575.  
  576. |> >Finally, four people simply cannot fit in the Soyuz (three is a VERY
  577. |> >tight squeeze, I understand).  
  578. |> 
  579. |> since we will use it for crew rotation we will launch two at a time.
  580. |> 
  581.  
  582. See note below.
  583.  
  584. |> >If we deploy two, there is a problem of where to put the
  585. |> >second.  There are only so many docking ports on Freedom and most are
  586. |> >already accounted for (cupola, hyperbaric airlock, logistics
  587. |> >modules, etc).
  588. |> 
  589. |> So we add another one. Multiple Soyuz is actually an advantage. First of
  590. |> all, it prevents single point failure. Suppose the module which connects
  591. |> to the ACRV is on fire and needs to be quickly closed down or is suffers
  592. |> major structural failure. The way it is now, the crew would have no way
  593. |> out. With two Soyuz, they could all pile into one, maneuver to the other
  594. |> and do an EVA to transfer the extra crew.
  595.  
  596. Serious problems here.  Again, there's just so many docking ports and
  597. as of a couple of months ago (the last time I saw a mission build
  598. plan) there just isn't an available outward facing port that can be
  599. used.
  600.  
  601. Your point about the single point failure is well taken, however, four
  602. crewmembers simply cannot fit inside a Soyuz return module.  Even if
  603. they could squeeze in for a few minutes, there would be no way to
  604. transfer to the other module as there is no airlock on the Soyuz and
  605. you certainly couldn't fit four suited crew members inside a Soyuz.  A
  606. natural response would be "Why don't you just EVA out of Freedom's
  607. airlock and traverse over to the second Soyuz then?"  Again, not
  608. possible.  The current EMU requires a substantial pre-breath before an
  609. EVA can be attempted.  Not a satisfactory way to quickly evacuate the
  610. station.
  611.  
  612. |> 
  613. |> Soyuz is also better if there is a medical emergency. With ACRV the entire
  614. |> station would be evacuated just because one guy got sick. Maintenance tasks
  615. |> wouldn't get done and time lost. With Soyuz, you just pack the sick/injured
  616. |> person and ship him back.
  617. |> 
  618.  
  619. This might be possible, but it is unlikely that any real work could be
  620. done with a two person crew (note that one non-incapacitated
  621. crewmember would need to return with the injured crewmember, if not to
  622. pilot the vehicle, then to be on hand to help in the recovery).
  623.  
  624. All in all, I believe that the Soyuz could make a satifactory ACRV,
  625. given sufficent modification to meet the needs of the mission.  It
  626. certainly isn't a trivial task to just "put it on an atlas and let go"
  627. like some here are suggesting.  
  628.  
  629. One other thing that hasn't been addressed here is that a universal
  630. docking adapter will have to be designed.  Currently NASA is looking
  631. into using the Russian "androgynos (sp??)" docking adapter on Freedom.
  632. That may be a possible solution to this problem.
  633.  
  634.  
  635. |>   Allen
  636. |> 
  637. |> -- 
  638. |> +---------------------------------------------------------------------------+
  639. |> | Allen W. Sherzer | "If they can put a man on the Moon, why can't they     |
  640. |> |  aws@iti.org     |  put a man on the Moon?"                               |
  641. |> +----------------------263 DAYS TO FIRST FLIGHT OF DCX----------------------+
  642.  
  643. mark,
  644.  
  645. -- 
  646. =====================================================================
  647. Mark L. Littlefield              Intelligent Systems Department
  648. internet: mll@aio.jsc.nasa.gov 
  649. USsnail:  Lockheed Engineering and Sciences 
  650.           2400 Nasa Rd 1 / MC C-19            
  651.           Houston, TX 77058-3711
  652. ====================================================================
  653.  
  654. ------------------------------
  655.  
  656. Date: 4 Aug 92 00:18:17 GMT
  657. From: "Allen W. Sherzer" <aws@iti.org>
  658. Subject: Soyuz as ACRV
  659. Newsgroups: sci.space
  660.  
  661. In article <64977@hydra.gatech.EDU> ccoprmd@prism.gatech.EDU (Matthew DeLuca) writes:
  662.  
  663. >>Red herring. HST isn't coming back on the shuttle either.
  664.  
  665. >It's an example.  Replace it with any complex and delicate piece of orbital
  666. >equipment that we might want to retrieve.
  667.  
  668. Like what? This piece of equipment needs to cost well over a billion $$
  669. before it is worth recovery with the Shuttle.
  670.  
  671. But I'm feeling generous today. I'll toss in a couple of billion from
  672. my savings to build a Shuttle compatible return module. Just bring your
  673. payload to the station (hell, I'll even spring for an OTV which I can
  674. pay for in about a years savings). We'll stick it in and teather it
  675. down for recovery. I'll even give you a price break since everything
  676. I teather down will save me fuel.
  677.  
  678.   Allen
  679.  
  680. -- 
  681. +---------------------------------------------------------------------------+
  682. | Allen W. Sherzer | "If they can put a man on the Moon, why can't they     |
  683. |  aws@iti.org     |  put a man on the Moon?"                               |
  684. +----------------------263 DAYS TO FIRST FLIGHT OF DCX----------------------+
  685.  
  686. ------------------------------
  687.  
  688. Date: 4 Aug 92 00:46:37 GMT
  689. From: John Roberts <roberts@CMR.NCSL.NIST.GOV>
  690. Subject: SPS and light pollution
  691. Newsgroups: sci.space
  692.  
  693. -From: ralph.buttigieg@f635.n713.z3.fido.zeta.org.au (Ralph Buttigieg)
  694. -Subject: Re: Solar Power Satellites
  695. -Date: 26 Jul 92 09:57:14 GMT
  696. -Organization: Fidonet. Gate admin is fido@socs.uts.edu.au
  697.  
  698. - to gwh@soda.berkeley.edu (George William Herbert), via *IXgate 3:713/602
  699. - g>         You're right, and most professional astronomers figure (rightly)
  700. - g> that given a miniscule percentage of the launch mass required for even a
  701. - g> lunar-materials using SPS, they can do better science from orbit
  702. - g> than they'll lose due to light pollution on the ground.  They just ask
  703.  
  704. - This is all very well for the pros but no great help for the rest of
  705. - humanity. No matter how fast Space is developed, the vast majority of
  706. - people will be living on Earth for centuaries.
  707.  
  708. - They will be the ones who lose out.
  709.  
  710. I find that my small telescopes make the sky appear a lot darker in
  711. comparison to the stars, even on nights when the moon is out. 
  712.  
  713. So perhaps the ones who would suffer are those who don't own even a small
  714. telescope, and those who want to do "world-class" astronomy on an amateur
  715. basis, and can't afford use of orbital instruments. 
  716.  
  717. I don't know how much SPS would affect ground-based searches for asteroids
  718. and comets, since they're basically searches for point sources that move
  719. over time, without much need to exactly characterize those point sources
  720. in the initial observations.
  721.  
  722. John Roberts
  723. roberts@cmr.ncsl.nist.gov
  724.  
  725. ------------------------------
  726.  
  727. Date: 4 Aug 92 00:26:47 GMT
  728. From: John Roberts <roberts@CMR.NCSL.NIST.GOV>
  729. Subject: SSF
  730. Newsgroups: sci.space
  731.  
  732. -From: cecil@physics.unc.edu (Gerald Cecil)
  733. -Subject: Re: Energiya's role in Space Station assem
  734. -Date: 3 Aug 92 14:53:53 GMT
  735. -Organization: University of North Carolina at Chapel Hill.
  736.  
  737. -So, my question: why is the Space Station being assembled in a 28.5 deg. 
  738. -orbit?  This locks out ANY participation by the CIS launch complexes for only 
  739. -a few % gain in payload.  (This also excludes the obvious benefit to earth 
  740. -observations of an orbit at 40+ degs, perhaps an important selling point to 
  741. -soon-to-be VP Gore.)  Concerns re abort sites are irrelevant, in that NASA 
  742. -has happily launched Shuttles to higher inclination orbits in the past.
  743.  
  744. To add to the arguments presented by others, re a higher inclination:
  745.  
  746. Pro: A larger percentage of the taxpayers could watch it pass overhead.
  747.      (At least, I *hope* that would be pro. :-)
  748.  
  749. Con: Higher inclination orbits are not as well protected from radiation
  750.      as the lower inclination orbits of the same altitude. Long-term
  751.      exposure to radiation is a significant concern for the SSF crew,
  752.      and radiation levels do get fairly high even at LEO during major
  753.      solar flares.
  754.  
  755. I've also mentioned the possibility of building it at high inclination
  756. orbit, then "warping" it to a low inclination orbit for use. Sure that
  757. would take a lot of energy, but you could use solar power, and we really
  758. need to learn how to use ion engines anyway. :-)  The big advantage is
  759. that Mir could be used as a construction shack, thus saving a *lot* on
  760. construction of SSF before it becomes habitable. Adminstrator Goldin's
  761. recent discussion on a proposal to dock a Shuttle to Mir for extended
  762. periods makes this even more technically attractive.
  763.  
  764. John Roberts
  765. roberts@cmr.ncsl.nist.gov
  766.  
  767. ------------------------------
  768.  
  769. Date: Mon, 3 Aug 1992 21:44:37 GMT
  770. From: TS Kelso <tkelso@afit.af.mil>
  771. Subject: Two-Line Orbital Element Set:  Space Shuttle
  772. Newsgroups: sci.space
  773.  
  774. The most current orbital elements from the NORAD two-line element sets are
  775. carried on the Celestial BBS, (513) 427-0674, and are updated daily (when
  776. possible).  Documentation and tracking software are also available on this
  777. system.  As a service to the satellite user community, the most current
  778. elements for the current shuttle mission are provided below.  The Celestial
  779. BBS may be accessed 24 hours/day at 300, 1200, 2400, 4800, or 9600 bps using
  780. 8 data bits, 1 stop bit, no parity.
  781.  
  782. Element sets (also updated daily), shuttle elements, and some documentation
  783. and software are also available via anonymous ftp from archive.afit.af.mil
  784. (129.92.1.66) in the directory pub/space.
  785.  
  786. STS 46     
  787. 1 22064U 92 49  A 92215.64583333  .00013459  00000-0  25599-3 0    55
  788. 2 22064  28.4712 336.1282 0007242 311.3562 119.2459 15.46519912   320
  789. EURECA     
  790. 1 22065U 92 49  B 92215.69805508  .00099984  00000-0  21195-2 0    34
  791. 2 22065  28.4691 335.7773 0007299  83.4067 276.6552 15.43555541   323
  792. -- 
  793. Dr TS Kelso                           Assistant Professor of Space Operations
  794. tkelso@afit.af.mil                    Air Force Institute of Technology
  795.  
  796. ------------------------------
  797.  
  798. End of Space Digest Volume 15 : Issue 067
  799. ------------------------------
  800.